InfraNEXT INFRA Pvt. Ltd.
Concrete hydropower dam under construction in a Himalayan river canyon
Sector 01 / Capability

Hydropower

From river intake to the switchyard.

Our capability

Grounded in the work.
Focused on the outcome.

Civil and hydromechanical works for run-of-river projects — headworks, waterways, powerhouses and switchyards — with engineering, installation, testing and commissioning. We completed the 10 MW Siddhi Khola project in Ilam and are building the 44.52 MW Sanibheri project in Rukum East.

See related projects
01

Headworks & intake

Weirs, intakes, gravel traps and desanding basins built into the river.

02

Waterways

Headrace canals, tunnels and penstock alignments.

03

Hydromechanical works

Gates, trash racks, penstock pipes and their installation.

04

Powerhouse civil

Machine hall, tailrace and control building structures.

05

Testing & commissioning

Bringing the plant online with the client and consultants.

Intake & headworksPowerhouseControl roomSwitchyard
Stage 01 / 04
Intake & headworks

The river is diverted, de-silted and led into the waterway.

Siddhi Khola output
0.0MW
Scroll to travel from the intake to the grid

Have a projectin this sector?

Planning, quality, safety and documentation included in every delivery approach.