
Sector 01 / Capability
Hydropower
From river intake to the switchyard.
Our capability
Grounded in the work.
Focused on the outcome.
Civil and hydromechanical works for run-of-river projects — headworks, waterways, powerhouses and switchyards — with engineering, installation, testing and commissioning. We completed the 10 MW Siddhi Khola project in Ilam and are building the 44.52 MW Sanibheri project in Rukum East.
See related projects01
Headworks & intake
Weirs, intakes, gravel traps and desanding basins built into the river.
02
Waterways
Headrace canals, tunnels and penstock alignments.
03
Hydromechanical works
Gates, trash racks, penstock pipes and their installation.
04
Powerhouse civil
Machine hall, tailrace and control building structures.
05
Testing & commissioning
Bringing the plant online with the client and consultants.




Stage 01 / 04
Intake & headworks
The river is diverted, de-silted and led into the waterway.
Siddhi Khola output
0.0MW
Scroll to travel from the intake to the grid
Have a projectin this sector?
Planning, quality, safety and documentation included in every delivery approach.
